MP 35         
After hitting the bottom of the grade at Melrose, NC, the tracks actually go back up another 1.5% grade before dipping down again! Sadly, both the milepost sign and switch stand in the distance have been removed/stolen.
Date: 5/19/2006 Location: Melrose, NC   Map Show Melrose on a rail map Views: 444 Collection Of:   Joe Hill
Author:  Joe Hill
MP 35
Picture Categories: This picture is part of album:  Saluda Grade 2006
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=385494